China Waterproof laminate floorin

Short Description:

Color We have several hundreds of color for your choice.
Thickness 7mm, 8mm, 10mm, 12mm are available.
Size 1218*198,1218*168,1218*148,1218*128,810*130,810*148,800*400,1200*400,600*100
Surface treatment More than 20 kinds of surface, such as Embossed, Crystal, EIR, Handscraped, Matt, Glossy, Piano etc.
Edge treatment Square Edge ,Mold press U-groove , 3 strips U grovoe, V-Groove with painting, bevel painting, waxing, padding, press etc. are provided.


Product Detail

Color Display

Installation

Technical Sheet

Product Tags

laminate-flooring-structure
36
41
37
42
38
43
39
44
40
45
changzhou-laminate-flooring

Parameter

Color We have several hundreds of color for your choice.
Thickness 7mm, 8mm, 10mm, 12mm are available.
Size 1218*198,1218*168,1218*148,1218*128, 810*130,810*148,800*400,1200*400,600*100
Surface treatment More than 20 kinds of surface, such as Embossed, Crystal, EIR, Handscraped, Matt, Glossy, Piano etc.
Edge treatment Square Edge ,Mold press U-groove , 3 strips U grovoe, V-Groove with painting, bevel painting, waxing, padding, press etc. are provided.
Special treatment Press U-groove,Painted V-groove,Waxing, Logo painted on back ,Soundproof EVA/IXPE
Wear Resistance AC1,AC2, AC3,AC4, AC5 standard EN13329
Base materials 770 kg /m³,800 kg /m³, 850 kg /m³ and 880 kgs /m³
Click system Unilin  Double , Arc , Single , Drop ,Valinge
Installation Method Floating
Formaldehyde Emission E1<=1.5mg/L, or E0<=0.5mg/L

Surface Available

Big-embossed-surface

Big Embossed Surface

Piano-surface

Piano Surface

Handscraped-surface

Handscraped Surface

Mirror-surface

Mirror Surface

EIR-surface-2

EIR Surface

Small-embossed-surface

Small Embossed Surface

Real-wood-surface

Real Wood Surface

Crystal-surface

Crystal Surface

Middle-embossed-surface

Middle Embossed Surface

Click Systems Available

click-type

Joint Available

Square-Edge
U-groove
V-groove

Back Colors Available

Brown-color
Beige-color
Green-color

Special Treatments Available

wax--no-wax

Quality Test

Inspection-machine-test

Inspection machine Test

High-glossy-test

High Glossy Test

Laminate Flooring Package Details

Packing List
  Size  pcs/ctn  m2/ctn ctns/pallet plts/20'cont ctns/20'cont kg/ctn m2/20'cont kgs/20'cont
1218*198*7mm  10 2.41164  70  20  1400  15  3376.296 21400
1218*198*8mm 10 2.41164 60 20 1200 17.5 2893.97 21600
1218*198*8mm 8 1.929312  70  20  1400  14  2701 20000
1218*198*10mm 9 2.170476 55 20 1100 17.9 2387.5236 20500
1218*198*10mm 7 1.688148 70 20 1400 13.93 2363.4072 20500
1218*198*12mm 8 1.929312 50 20 1000 20 1929.312 20600
1218*198*12mm 6 1.446984  65  20  1300  15  1881  19900
1215*145*8mm 12 2.1141 60 20 1200 15.5 2536 19000
1215*145*10mm 10 1.76175 65 20 1300 14.5 2290.275 19500
1215*145*12mm  10  1.76175  52  20 1040 17.5 1832 18600
810*130*8mm  30  3.159 45  20 900 21 2843.1 19216
810*130*10mm 24 2.5272 45 20 900 21 2274.48 19216
810*130*12mm  20  2.106 45  20 900  21 1895.4 19216
810*150*8mm 30  3.645 40 20 800 24.5 2916 19608
810*150*10mm 24 2.916 40 20 800 24.5 2332.8 19608
810*150*12mm  20  2.43 40 20 800  24.5 1944  19608
810*103*8mm  45  3.75435 32  24  768  27.2  2883 21289.6
810*103*12mm  30  2.5029  32  24  768 26 1922 20368
1220*200*8mm  8 1.952  70  20  1400 14.5 2732 20700
1220*200*12mm 6  1.464  65  20  1300 15 1903 19900
1220*170*12mm  8 1.6592  60  20  1200 17 1991 20800

Warehouse

laminate-flooring-warehouse

Laminate Flooring Container Loading -- Pallet

Warehouse

laminate-wooden-flooring-warehouse

Laminate Flooring Container Loading -- Carton


  • Previous:
  • Next:

  • 43
    43
    43
    43
    43

    about171. Teach you how to install laminate flooring by yourself

    Step 1: Prepare tools

    Tools required:

    1. Utility knife ; 2. Tape measure ; 3. Pencil ; 4. Hand saw;  5. Spacer ; 6. Hammer ; 7. Rocking rod

    Material requirements:

    1. Laminate floor 2. Nail 3. Underlayment

    Step 2: Preparation before installation

    1. Laminate flooring adapts to the environment

    Please put the laminate flooring you have purchased in the room to be laid at least 2 days in advance, and give them enough time to adapt to the expansion or contraction of the room temperature and humidity. This prevents bending or other problems after installation.

    2. Remove the skirting

    Remove the existing skirting line from the wall using a pry bar. Put the part aside and reinstall it. Floating laminate (the kind used in this project) should be installed on a hard, smooth surface, such as vinyl. If the existing floor is damaged, remove it to expose the floor.

    1

    Step 3: Start the installation

     Installation base materials

    1. Installation base

    Install the cushion to the floating laminate floor. Remove staples, nails and other debris from the floor. Do not overlap adjacent strips, use a utility knife to chop them as needed. The foam padding can attenuate the sound and help the floor feel more elastic and durable.

    2

    2. Planning the layout

    To determine the direction of the plank, consider which wall is the longest and the straightest. Avoid narrow strips on the focal wall. The plank in the last row should be at least 2 inches wide. Draw a picture on the 1/4 inch gap of each wall.

    Note: If the width of the last row is less than 2 inches, add this width to the width of the whole board and divide it by 2, and cut the first and last rows of boards to this width.

    3. Cutting work

    Depending on your layout, you may need to tear or cut the first row of boards longitudinally. If using an electric saw, cut the finished side down; if using a hand saw, cut the finished side up. When cutting boards, use clamps to fix the boards.

    4. Reserve space

    Laminate flooring kits require space to be wedged between the wall and the planks to leave a 1/4 inch expansion joint. Once the base plate is installed, it will not be visible.

    3

    5. Shop the first row

    Install the tongue side of the plank facing the wall (some manufacturers recommend that you cut off the tongue of the plank facing the wall). Connect one plank to another by connecting tongues and grooves. You may be able to connect the boards tightly by hand, or you may need to use the tie rods and hammers in the installation kit to pull them together, or use tapping blocks to screw the joints together. Cut the last board in the row to length (if it is at least 12 inches long, keep these small pieces).

    4

    6. Install other lines

    When installing other rows, stagger the seams in adjacent rows by at least 12 inches, as seen on wooden or brick walls. Usually, you can start a new line with scrap from the cut plank to end the previous line.

    5

    7. Install the last line

    In the last row, you need to slide the plank into place at an angle, and then gently pry it into place with a pry bar. Make sure to leave a 1/4 inch expansion joint between the last row and the wall.

    6

    8. Cut the door frame

    Don’t try to cut the plank to fit the door frame. Instead, use a side saw to cut the door frame to about 1/16 inch higher than the floor height, so that the board room can slide under the frame. Place a cushioned floor on the floor and close to the shell. Place the door frame saw on the top, and then cut the shell to the desired height.

    7

    9. Reinstall other materials

    Reinstall the decorative strip. After the plank is in place, use a hammer and nails to reinstall the flooring skirting trim. Then, install the shoe mold on the expansion joint and use the transition strip to connect the laminate to the adjacent surface, such as tile or carpet. Don’t nail it to the floor, but nail it to the decorations and walls.

    8

    about172. Laminate flooring click system

    It include different click system, just click shape is different , but same install way.

    It name , Single click , Double click ,Arc click , Drop click, Unilin click , Valinge click.

    Click-style-2

     

    about173. Newest Laminate flooring lock system

    12mm Drop click laminate flooring best advantage is Fast Install, Save more 50% install laminate wooden flooring times.

    Drop-click-1 drop-lock-

    Laminate-Flooring-Technical-Specifications

    Write your message here and send it to us

    RELATED PRODUCTS

    

    Meet DEGE

    Meet DEGE WPC

    Exhibition Name: 

    BAU 2025

     Booth No.: 

     A6-539

     Exhibition Time: 

    Jan 13-17 , 2025

    Address:

    Trade Fair Center Messe München

    Am Messeturm, 81829 Munich